Project name: Ilijan Power Plant (Kepco Ilijan Corporation), Project id: Country: Philippines, Location: Province of Batangas, Batangas. Financial Closure. Ilijan CCGT Power Plant Philippines is located at Ilijan, Batangas City, Philippines. Location coordinates are: Latitude= , Longitude. Type: Gas Power Plant; Area: Luzon, Batangas; Kind of Fuel: Natural Gas; Origin of Fuel: Malampaya Gas Field; Power Capacity: 1, MW (6.

Author: Got Faezahn
Country: Cape Verde
Language: English (Spanish)
Genre: Love
Published (Last): 28 September 2008
Pages: 396
PDF File Size: 15.26 Mb
ePub File Size: 1.18 Mb
ISBN: 564-9-12519-864-5
Downloads: 81911
Price: Free* [*Free Regsitration Required]
Uploader: JoJokus

The plant entered commercial service on June 5, Rotor cooling air is provided with compressor discharge air extracted from the combustor shell.

Ilijan combined-cycle project operational summary. It was literally carved out of the Philippine jungle by an international consortium of developers, engineers, and contractors.

First G series turbine outside Japan. Those figures are remarkable, considering the remoteness of the project and the extensive infrastructure that had to be built to support it see table. In addition, all the plant water has to be made from seawater, including NOx injection iljian. RSS feed for comments on this post. All three trains can be put into service when the plant burns diesel oil to supply adequate makeup demin water to the combustion turbines when water injection is used to control NOx emissions.

Entries and comments feeds. Rita power plant consists of four 4 units ikijan a plant rated capacity of MW each when operating on liquid fuel Ilijan combined-cycle project operational summary Source: Inside the combustion chamber, the flame temperature of G combustors is between 2,F and 2,F. Fill in your details below or click an icon to log in: The G gas turbine uses steam taken from the bottoming cycle for cooling the combustor liner.

  DIETZ 61010 PDF

The water treatment system provides a continuous supply of the high-quality demin water required for plant palnt, gas turbine water injection for NOx control, and dilution water for chemical feed systems. This powet is supplied as the cooling and sealing air for the turbine disks and rotating blades after being externally cooled and filtered.

Commercial operation of the power plant was in June 5, Notify me of new comments via email. By continuing to use this website, you agree to their use. San Miguel Energy Corporation who was declared as the highest bidder last 16 April won the administration of the 1, MW Ilijan. Liquid ;ower was used as back-up fuel thereafter.

Obstacles that developers of plants in the U. The plant cannot operate in simple-cycle mode because it has no bypass stack. Direct compressor discharge air is used to cool the first-stage vane, while the compressor bleed air from intermediate stages is used as cooling air for the turbine blade ring cavities and for the second- third- and fourth-stage vanes.

Each unit is composed of a gas turbine, a steam turbine generator connected to a common shaft and the corresponding heat recovery steam generator. REOL for the construction phase. The plant was operated on liquid fuel gas oil, naptha, condensate until the end of Rita, Batangas City adjacent to Sta.

Power Gas Markets

In the mids, the Philippine government decided to develop the Camago-Malampaya gas fields in the Province of Palawan to foster growth of the economy of Southern Luzon.

Seawater is used for condenser cooling water. The plant consists of two 2 units with a plant rated capacity of MW each when operating in liquid fuel The plant also includes a transmission line which interconnects the Sta. The water treatment plajt works in three stages: Obstacles overcome Two very significant obstacles had to be overcome to complete the project.

  ISO IEC 16022 PDF

First G series turbine outside Japan The Mitsubishi G series gas turbines Figure 3 operate with a turbine inlet temperature of 2,F and use steam to cool their combustor liners. Email required Address never made public. The plant started using natural gas on commissioning stage in February Cooling ilijaan for the turbine section are similar to those of the F series. The plant is located at Sta. But for Ilijan, the end justified the means. The Ilijan power plant consists of two blocks, each comprising of two gas turbine generators, and one steam turbine generator.

Two very significant obstacles had to be overcome to complete the project.

Ilijan Power Plant | Joel Chavez Group of Companies

The 1,MW Ilijan combined-cycle plant is truly a greenfield plant. In addition, the site was often visited by heavy storms and typhoons that slowed construction and delayed the delivery ilijqn equipment and materials.

Each gas turbine generator has a nominal expected gross rated output of MW and MW for each of the turbine generators. Each unit is composed of gas turbine, steam turbine generator and the corresponding heat recovery steam generator. The plant has two power blocks, each a 2 x 1 configuration based on the Mitsubishi G gas powrr. San Lorenzo power plant started using liquid fuel gas oil, naptha, condensate for testing and commissioning by late